TQM Implementation Project Part 7a (Amended)- The CONTROL Phase How to Do It

The CONTROL Phase in implementing anupper and lower end of the mean line. While the mean
improvement project is most neglected step but criticalline is easy to determine, since it is an average line of
step. It is done to ensure corrective actions or short orthose data. The other two lines is not so straight
long term solution put in placed are effective and ableforward. It required some calculations to determine the
to yield expected results. It cannot be overposition of the line drawn.
emphasized the importance of CONTROL.I do not intend to work out the detail calculation of the
They are some basic tools used in this phase, namely:-two lines. Briefly, one of the line which is placed above
Trend Charting | Control Chart | Documentation | Audit |the mean line is called the upper control limit (UCL) and
On-job training | Re-certificationthe other line which is placed below the mean line is
In this issue, I will deal with Trend Charting. Not onlycalled the lower control limit (LCL). These two line are
team member need to control the improvement result,the boundary of the data performance in which should
equally important they track its continuity. Correctivebe within these limits at any time. If it is out of the
action and short and long term solutions are criticalrange, then it indicates an out of control situation.
components of the whole Improvement Projects toInvestigation need to be taken place to find out why
ensure sustainability of the improvement. However,the data is out of range.
members tends to keep track of the result withoutThis control chart is useful to monitor the trend of the
realizing it is that it is the corrective actions andperformance in term is the control limits. However, in
solutions that bring about the improvement. In anotherreal situation, it is more complicated as there are cases
words, the results is the consequences of the actions /where the data performance is within the two lines, it is
solutions.still consider out of control. Example, if the data move
During this phase, least difficulties were encounteredalong above the mean line for more than 7 points in a
by team members. Perhaps it was due to the factrow. It is called a "RUN".... There are several others but
that most action / solution are taken placed in thewill not be discussed here.
work area they are in charge. However, there areIn summary, the trend chart and control chart is used
cases where teams are set up for a cross-functionto monitor the performance of the data. However, by
project in which action / solution to be taken are inthe time it is plotted onto the chart, it is already history.
work areas not the responsibility of the teamNevertheless, it is still a good tools to track the
members. In which case, team members faced withperformance of the data basic on his performance
the following difficulties :-a) Action and solution are notover time. This will tell the team whether their solution
carried out consistentlyb) Some of the line workersprovides a long term sustainability performance. In my
are not aware of the changesc) Tracking is focus onnext article, I will deal with Documentation and Audit of
results but did not extend to the action / solutionsolution.
Besides tracking and monitoring, it is important that newDisclaimer: This article is written by the author based
action / solution are standardized across the companyon his practical application experience. All definitions
with simple yet effective work instructions andand interpretation of terminology are his point of view
Standard Operating Procedures. And they areand has it has no intention to conflict with experts in
periodically audited for compliance. That Managementsimilar field. The author holds no responsibility for the
team has included these items in their operation reviewuse of this article in any way.
meeting until such a time they feel it is sustainable.Free to reprint or re-publish: All rights reserved. You
Control Chart This is a statistical chart that use toare free to reprint or re-publish this article as long as
track the performance of a measures over time. Ityou include my resource box at the end of this article.
look like a line chart except that it has 3 additional linesPlease ensure that the URL in the resource box
around the line chart. One of the three lines is theremain intact and it is linked to the author's website.
Mean or average line, the other two are drawn on the